Question: Do I Need A Drip Edge On A Shed?

Should shingles extend past drip edge?

Shingles should not extend more than 3/4” (19 mm) past the drip edge.

If shingles overhang the edge of the roof by more than 3/4” (19 mm), then they are not supported and may crack and break off..

What is the difference between drip edge and rake edge?

Drip edge and rake edge are the first parts of the roof system to be installed. … They form a long, narrow piece of metal, which is installed along the perimeter your Roof Deck. Drip edge goes along your eaves trough areas and rake edge goes along your gable ends.

What nails do you use for drip edge?

The drip edge is nailed in place using 1-1/2 galvanized roofing nails. A felt-tip marker works great for marking cuts. And, again, prying open the end with a small flat bar allows the pieces to overlap cleanly.

Should drip edge be tight to fascia?

Nail thefurring strip to the fascia board near the fascia top – tight under any extending of roof decking (usually absent); the Drip edge will be installed 1/8″ proud of (away or out from) the furring strip in best practice or may be installed tight against the furring strip (reduces the life of the furring strip by …

Do all roofs have a drip edge?

Without a drip edge, water may end up beneath the shingles and may cause damage to various parts of the home. Though your home may not have originally had a drip edge installed, drip edges are now required by most building codes across North America to protect homes from damage.

How important is drip edge?

Drip edge is the flashing that protects the edges of your roof, both the eaves and the gable ends. This is great because it protects the wood structure underneath your roofing shingles, an area of the roof you can’t see … but one that’s prone to water damage and wood rot. …

Do you need to replace drip edge when replacing roof?

Drip Edge Flashing Drip edge comes in 10-foot strips and attaches to the roof deck before the roofing felt goes on. Unless the old drip edge is in like-new condition, replace it.

How much does drip edge cost?

Drip Edges: $1-$2 per linear foot installed. Inspect and replace drip edges as necessary. Drip edges are added to the roof to direct water into the gutters. Other Damage – Have a professional inspect your eaves for damage before repairing fascia and soffits.

How do you finish the top edge of a shed roof?

How to Finish the Top Edge of a Shed RoofFor the final row, cut shingles into strips.Ensure strips are wide enough to cover nails.Install your strips.Apply sealant over exposed nails on the last strip.Use more sealant along the top edges of all shingle strips.

How far should shingles overhang drip edge?

¼ to ¾-inchAsphalt shingles should overhang the exterior edge of the drip edge by ¼ to ¾-inch. Check local building code for drip edge requirements prior to the start of your roofing project.

Is a drip edge necessary on a metal roof?

A: A drip edge is not always required by local building codes, but installing a drip edge is a good idea—especially if the home is in an area that experiences a lot of wind-driven rain. This applies whether you are working with asphalt or metal because a drip edge allows water to fall away from the fascia.

Can you install drip edge after shingles?

The drip edge is often replaced when new shingles are installed, but it can be replaced at any time. Asphalt roof shingles can become brittle in cold weather, so wait until a warm (but not hot) day to remove and replace eave stripping.

How do you install drip edge on a shed?

How to Install Drip Edge on Shed RoofInstall eave drip edge by nailing it to the sheathing.Extend drip edge an inch at each end.Install roofing felt.Install rake drip edge over the felt.Nail every 12” or less. Make sure rake edge overlaps.Rake drip edge overlaps the eave drip edge.Bend eave drip edge corners under rake edge.

Does drip edge go under tar paper?

The best way is to install the roof drip edge only along the eaves first, then place ice-and-water barrier (in the snowbelt) or felt paper (underlayment) over the drip edge. This lets any water that gets on the roof run down the underlayment and over the drip edge.

What size drip edge should I use?

I usually select drip edges with at least a 4-inch roof leg along the eaves edge and a 2-inch leg along rakes. The code calls for the fascia/rake leg to extend 1/4 inch below the roof sheathing and the Fortified Home guides call for 1/2 inch. But I like to use drip edge with at least a 1-inch fascia/rake leg.