Do You Need Drip Edge On Shed Roof?

Do you need to replace drip edge when replacing roof?

Drip Edge Flashing Drip edge comes in 10-foot strips and attaches to the roof deck before the roofing felt goes on.

Unless the old drip edge is in like-new condition, replace it..

How much does drip edge cost?

Drip Edges: $1-$2 per linear foot installed. Inspect and replace drip edges as necessary. Drip edges are added to the roof to direct water into the gutters. Other Damage – Have a professional inspect your eaves for damage before repairing fascia and soffits.

Do I need a drip edge on a shed?

Your shed should be built to withstand the elements. That means repelling water in the most efficient way possible. Installing drip edge around the perimeter of the shed is the best way to keep water out and away from your shed.

What is the purpose of a drip edge on a roof?

Drip edge is a metal flashing that is installed at the edges of the roof to help control the flow of water away from the fascia and to protect the underlying roofing components. Drip edge overhangs the sides of the roof and has a small metal flange that is bent away from the fascia.

Does drip edge go under felt?

It depends on where the drip edge is. At the side, or gabels, of a roof, the drip edge goes over the roofing felt. At the bottom of the roof, the drip edge goes under the roofing felt.

What nails do you use for drip edge?

The drip edge is nailed in place using 1-1/2 galvanized roofing nails. A felt-tip marker works great for marking cuts. And, again, prying open the end with a small flat bar allows the pieces to overlap cleanly.

Do you nail or staple roofing felt?

Roll out about 10 feet of felt and fasten with staples or roofing nails with plastic washer heads. Use a construction stapler or a hammer. Put fasteners at least every 8 inches; some suppliers recommend staples about every 4 inches.

What goes first drip edge or felt?

The best way is to install the roof drip edge only along the eaves first, then place ice-and-water barrier (in the snowbelt) or felt paper (underlayment) over the drip edge. This lets any water that gets on the roof run down the underlayment and over the drip edge.

What is the difference between drip edge and rake edge?

Drip edge and rake edge are the first parts of the roof system to be installed. … They form a long, narrow piece of metal, which is installed along the perimeter your Roof Deck. Drip edge goes along your eaves trough areas and rake edge goes along your gable ends.

Can drip edge be installed after gutters?

If the overlap is too short, fix it by placing drip edge under the first row of roof shingles and be sure that the exterior edge is reaching over the gutter. If the gutter is lower than the bottom edge of the drip edge, install flashing behind the drip edge and over the back edge of the gutter to remove the gap.

Do gutters go over or under drip edge?

Water Gets Behind the Gutter The gutter apron will prevent the dripping. … If there’s a drip edge installed where the fascia meets your shingles and the gutter is hung below the drip edge, get some roll flashing and tuck it up under the drip edge and over the top of the gutter.

Can you put drip edge on after shingles?

The drip edge is often replaced when new shingles are installed, but it can be replaced at any time. Asphalt roof shingles can become brittle in cold weather, so wait until a warm (but not hot) day to remove and replace eave stripping.

Does a roof need drip edge?

Without a drip edge, water may end up beneath the shingles and may cause damage to various parts of the home. Though your home may not have originally had a drip edge installed, drip edges are now required by most building codes across North America to protect homes from damage.

How far should shingles overhang drip edge?

¼ to ¾-inchAsphalt shingles should overhang the exterior edge of the drip edge by ¼ to ¾-inch. Check local building code for drip edge requirements prior to the start of your roofing project.

How do you finish the top edge of a shed roof?

How to Finish the Top Edge of a Shed RoofFor the final row, cut shingles into strips.Ensure strips are wide enough to cover nails.Install your strips.Apply sealant over exposed nails on the last strip.Use more sealant along the top edges of all shingle strips.